Well Saturday was a VERY disappointing day – we woke up to torrential rain. Matt spent the whole day pacing up and down the house – very frustrating. The building site across the road started up there inside work and all matt could say was “are they teasing me” – hahaha. Sunday was better, after a nice fathers day brekky with Rossco and Robyn – matt got stuck into it. In his words he ‘detailed the posts’ – not quite sure what that means but lets just say he connected the metal thingamejigs to the posts that will hold the addition up!? Worked out that the timber that was delivered – was a little wrong. But called up the timber yard who fixed there wrongdoing up straight away. Today (Monday) came and I headed off to work after about ½ an hour of measuring up in the mud before I left! Hmm! Matt had the day off to work on the house. Arrived back at 5pm to see matt has been hard at it all day and finally now has caught up from Saturdays off day and has part of the floor frame done! Good job. The sun was fading quickly, we packed the tools up and had a walk on the floor – thought we saw glimpses of ocean from the new height– we wish!