OK so if the bathroom has been demolished and were showering outside.... wheres the toilet... yep its in the middle of the room.. temporarily set up but to disies surprise it flushes!! So there is a temporary boards up around it.. but i was a little concerned about the houses up on the hill looking over the top.. took about stage fright! I also now have to text any visitors before they come over to have a wee as our bathroom isnt up to entertaining standards!!!!!
The roof was to come off next.. to be replaced as a skillion (slope) roof made from colourbond. With help from both the dads (cliffy and rossco).. tiles were off in a day! There are no photos of the tiles coming off as i was at work and boys dont think of things like that!! But good job anyways!
5 skip bins full of rubble, roof tiles, gyprock, bathroom tiles etc got sent away so we decided to burn all the timber (that wasnt already dust from the termites) in the 44 gallon drum cliffy got us from busways (dont worry he didnt steal it and no it didnt have petrol stored in it). The picture below of the pile of timber... think of that x 5 .. we will be burning timber for months!!
everything is coming out
1800 - disies sweeping service to the rescue
this is nothing.. our plan was to burn all the timber..